Because I’ve already shown how the 2mm stringer is tack fused and then cut to form the two sides of the this bubble sandwich, I thought I’d just jump right to the final fusing. These smaller bubble projects are intended as coasters and measure 4×4″.

Bubble Sandwich
02.

Fused and Done

Being done after the full fuse since, there’s no need to slump, makes coaster projects fun and breezy.

Fully fused.
Results

Final Result

Surprise: It’s a set of four.

Four coasters finished.

Close-up One

I’ve put clear rubber bumpers on the underside of each corner so they won’t slide around on a table. The coasters are less work than the plates, but just as pleasing to look at.

Corner Close-up
Where are the grapes?!

TACK FUSING SCHEDULE (RUN TIME 8:48, 14.4 KWh)*

SEGMENT RATE (deg F / hour) TEMPERATURE (F) HOLD (hours:minutes)
1 300 1000 :00
2 225 1225 :30
3 AFAP 1400 :00
4 AFAP 950 1:00
5 100 725 OFF

FULL FUSING SCHEDULE (RUN TIME 13:29), 19.7 KWh*

SEGMENT RATE (deg F / hour) TEMPERATURE (F) HOLD (hours:minutes)
1 150 1000 :15
2 225 1225 :30
3 AFAP 1475 :20
4 AFAP 950 1:30
5 100 725 OFF